TS-Topographic Survey, ST-Soil Test, A-Architectural Plan, D-Detail Design, E/M-Electro-Mechanical Design, E/T-Estimate & Tendering, S-Supervision
Sl. No. |
Name of Project |
Brief Description of Project |
Service |
Project Cost |
Completion Date�
|
Remarks |
Consultancy Fee in Tk. |
World Bank /
IDA |
|||||||
1 |
Construction Supervision of Dormitory Building �&
Training Centers of the Northern Areas Reduction of Poverty Initiative (NARI)
Project, Funded by World Bank, IDA Credit No: 5015- BD. Client: Export Processing Zone Authority (BEPZA) |
DEPZ,
Savar, Dhaka. a) Construction of 2-
Storied Dormitory Building with (4- Storied Foundation including Piling). b) Construction of 2-
Storied Ladies Hostel Building with (4- Storied Foundation including Piling). c) Construction of 2-
Storied Training Center Building with (4- Storied Foundation including
Piling) & Boundary wall, Internal Roar, Electricity, Water Supply etc. IEPZ, Ishwardi, Pabna a) Construction of 2-
Storied Dormitory Building with (4- Storied Foundation including Piling). b) Construction of 2-
Storied Ladies Hostel Building with (4- Storied Foundation including Piling). c) Construction of 2-
Storied Training Center Building with (4- Storied Foundation including
Piling) & Boundary wall, Internal Roar, Electricity, Water Supply etc. IEPZ, Karnafuli, Chittagong. a) Construction of 2-
Storied Dormitory Building with (4- Storied Foundation including Piling). b) Construction of 2-
Storied Ladies Hostel Building with (4- Storied Foundation including Piling). c) Construction of 2-
Storied Training Center Building with (4- Storied Foundation including
Piling) & Boundary wall, Internal Roar, Electricity, Water Supply etc. |
TS, ST, A, D, E/M, E/T, S |
|
June-2014 |
Financed by
World Bank / IDA. |
|
2 |
Detail Design, Supervision & Monitoring DSM Consultancy Services for�� DCC infrastructure Component Clean Air-
Sustainable Environmental (CASE) Project, Cr- 4581 BD. Funded by IDA, (Urban-
Road- Improvement). Client: Dhaka City Corporation (North &
South). |
Feasibility Study, Detail Design, Tender
Management and Construction Supervision of Dhaka Urban Road in Mahammadpur, Khailgaon, Uttara
& Old Town Mirpur, Shamoli & Tejgaon Area
160.0 KM, Pavement Improvement CC Road, improvement of 40-intersection,
Street Light, Solar Panel, Time Court down, 20-Nos. Steel Foot over bridge
and Fixing of Escalator in Banni Foot over Bridge, Improvement RCC, Pipe
& Brick Drain, Foot-path, Environmental Study, Social Safeguard,
Topographic Survey, Soil- investigation, Project Management & Monitoring
etc. under Dhaka City Corporation, Funded by World Bank.���� |
TS, ST, A, D, E/M, E/T, S |
|
June-2015 |
Financed by
World Bank / IDA. |
|
3 |
Legal and Judicial Capacity
Building Project, Contract Package #S-20,
IDA Credit No. 3485-BD under
Ministry of Law Justice and Parliamentary Affairs
|
Construction of - l
12-storied Judge Court
Building Complex at Dhaka with One Basement, Sub-station, Generator, Lift,
Fire-fighting, Aluminum Door & Window, Modern fitting & fixing. l
12-storied Judge Court
Building Complex at Dhaka with Basement l
5-storied Judicial
Administration Training Institute Complex (JATIC) in Dhaka with Basement with
12-storied foundation. l 5-storied District Judge Court Complex at Khulna. l 5-storied District Judge Court Complex at Rangpur. l 5-storied District Judge Court Complex at Comilla. l 5-storied District Judge Court Complex at Sylhet. l 5-storied District Judge Court Complex at Bogra. l 5-storied District Judge Court Complex at Noakhali. l 5-storied District Judge Court Complex at Rajshahi. l 5-storied District Judge Court Complex at Barisal l 5-storied District Judge Court Complex at
Mymensingh. l 5-storied District Judge Court Complex at Pabna. l 4-storied District Judge Court Complex at Bhola l Vertical extension of 2nd floor of District Judge Court at Moulvibazar. l Vertical extension of 2nd floor of District Judge Court at Brahmanbaria. l Vertical extension of 2nd floor of District Judge Court at
Feni. l Vertical extension of 2nd floor of District Judge Court at Gopalgonj. l Vertical extension of 2nd floor of District Judge Court at Bagherhat. l Vertical extension of 2nd floor of District Judge Court at Thakurgaon. l Vertical extension of 2nd floor of District Judge Court at Munshigonj. l Vertical extension of 2nd floor of District Judge Court at
Cox�s Bazar. l
Vertical extension of 2nd
floor of District Judge Court at Madaripur. |
TS, ST, A, D, E/M, E/T, S |
|
June 2006 |
Financed by
World Bank / IDA. |
|
4 |
Bangladesh Sericulture Research & Training
Institute, BSRTI, Strengthening Project, IDA Credit No. 3004-BD Client: Ministry of Jute & Textile. |
Planning, Designing & Managing Construction of the following
works: (i) Office Building, Staff Quarter, Generator
Room, Rearing House, Grainage, (ii) Land
Development iii) Internal Road� (iv) Fencing and (v) Additional
(Pump) at Sakua, Boda, Panchagar and (i)
Farmhouse, Silk conditioning house, Extension of Research Building,
Generator Rooms (2 Nos.), Reeling Shed, Rearing House (60M�) (ii) Renovation
of Research Building & Other Buildings (iii) Drainage (iv) Fencing (v)
Land Development at BSRTI Campus, Ghoramara, Rajshahi. |
TS, ST, A, D, E/M, E/T, S |
|
July 2003 |
Financed by
World Bank / IDA. |
|
5 |
Agriculture Research Management
Project (ARMP) funded by World Bank, IDA Credit No. 2812-BD under Bangladesh
Agriculture Research Council (BARC), Ministry of Agriculture
|
Planning, Designing & Managing
Construction of the following works The Project includes
Preparation of Research Master Plan & improvement of Research facilities,
training facilities & residential facilities in various Agricultural
Research Institute (ARI's) like : BARI, BRRI, BFRI, FRI, BLRI, BARC. Total structure is about = 200 unit.
Construction of-
�
Laboratory cum Research Building, �
Training Institute, Farm Development Master Plan, Open Channel,
Irrigation, Drainage facilities �
Construction of Training building, �
Officer's residential building & Staff quarter, �
Sinking of DTW, Water supply, Irrigation etc. �
Internal & External Electrification, �
Furniture for Office, Laboratory, �
Conference hall, Training hall, �
Computer Room etc. �
Boundary wall, Bridge, Culvert etc. �
|
TS, ST, A, D, E/M, E/T, S |
|
May 2000 |
Financed by
World Bank / IDA. |
|
6 |
Storm
Sewerage from Sutrapur to Diagonj,
Zirani Khal including construction of 2.5km RCC,
Box-culvert to pass the storm sewerage at old part of Dhaka City Corporation
under the name of Environmental Improvement Project funded by IDA under
Ministry of Local Govt. Client: Dhaka City Corporation (DCC). |
Dhaka City
Corporation implemented Dholaikhal�s Improvement
Project. The Consultancy is required for the supervisory and review of
existing design which including; (i) Contract
Management and Administration, (ii)
Supervision of construction. The main
components of this projects are: �
Construction
of R.C.C. Box-culvert about 2.5Km length and size of 2.5mx3.5m to flow
drainage wall. �
Casting of
R.C.C. box culvert, lined channel, junction boxes. �
Construction
of new urban road, about 2.25Km length 24.5 Meter width with 2.5 Meter
Footpath on both side. The new road consists of each
work, sand filling, sub-base, base, water macadam and bituminous carpeting. �
Detour of
prevailing traffic, Demolishing the Narinda Pump
house & Bridges etc. at different locations. �
Laying of
pre-cast concrete blocks to slopes, Roads works, Fabric filter of slopes,
Road gutter & Catch-pit, Footpath, Cabling & street lighting. Road
Pavement Site
preparation, Back filling & Compaction, Macadam Base, Water line/Drain,
Bituminous Carpeting, Guide wall, Footpath. Electrical
Works Election of Pole, Cable laying, Light fixtures,
Electric supply connection. |
TS, ST, A, D, E/M, E/T, S |
|
June 2000 |
Financed by
World Bank / IDA. |
|
|
|
�
Holding house, Threshing floor, Implement shed �
Repair and Rest house, Dormitory �
Internal road, Irrigation system, �
Deep tube well, Pump house and water supply, Boundary fencing, Godown
& Garage, �
Farm development & electrification work, �
Supply of Furniture |
|
|
|
|
|
|
|
Horticulture Research
Station at Hathazari, Chittagong: Construction of- �
Laboratory cum functional building �
4-storied single accommodation for
officer �
4-storied single accommodation for
staff �
Pso/cso quarter �
Repairing work �
Field house, holding house, nursery house �
Godown & garage �
Land development & farm development, �
Internal road �
Sub-station, electrification work �
Irrigation system & irrigation channel |
|
|
|
|
|
|
|
Horticulture Research
Station at Rahmatpur, Barisal : Construction of- �
Laboratory cum Functional Building �
4-storied single accommodation for
staff �
PSO/CSO Quarter & SSO/SO Quarter �
Holding house, �
Threshing floor �
Land Development, �
Farm Development Deep tube-well and water supply. |
|
|
|
|
|
|
|
Mango Research Station at Nowabgonj : Construction of- �
Laboratory cum functional building with Training Facilities �
Field house & Threshing floor |
|
|
|
|
|
7 |
Consultancy Service for Avian Influenza
Preparedness & |Response Project (AIPRP) Loan � IDA- credit. Cr. 4340- BD. Of DLS. Client: Department of Live- stock services. |
Construction of Bird (Kitchan) Market, improvement of water & Drainage
Facilities etc. |
TS, ST, A, D, E/M, E/T, S |
|
December 2013 |
Financed by
World Bank / IDA. |
39.0 Lakh |
8 |
Establishment of Forest College at Nasirabad,
Chittagong under FRMP (Forest Research Management Project) Funded by World Bank. Client: Depart of Forest. |
The work includes the : �
Construction of (4-storied Academic/ Educational) building with class
room, Laboratories, Conference hall, Administrative
section and other related work. �
Construction of 4-storied student hostel, including indoor games, dinning hall, kitchen etc. �
Construction of 4-storied Forest Dormitory �
Land Development work, Retaining wall, Boundary wall, Water Reservoir
& Water supply pump house �
Residential building etc. |
TS, ST, A, D, E/M, E/T, S |
|
July 1996 |
Financed by
World Bank / IDA. |
|
|
ASIAN DEVELOPMENT BANK/ ADB |
||||||
|
|
|
|
|
|
|
|
1 |
Consultancy
Services for Construction of 15-storied Building with 2-Floor Basement of
Head Office Building for Directorate of Primary Education, at Mirpur-2,
Dhaka, Funded by ADB. Client: Directorate of Primary Education,
Mirpur-2, Dhaka. |
Construction
of 15-storied Building with 2-Floor Basement of Head Office Building for
Primary Education, Directorate at Mirpur-2, Dhaka, Funded by ADB. Total
Area= 204,000.00 Sft. Mat Foundation, 4- Lift, Sub- station, Generator,
Fire-fighting CC TV, Air- Conditioning, Electro- Mechanical Works. |
TS, ST, A, D, E/M, E/T, S |
|
December 2014 |
Asian Development Bank/ ADB |
|
2 |
10- Storied Leadership Training
Center at Cox�s Bazar under Director ate of primary Education.
Directorate of
Primary Education. Client:
Directorate of Primary Education. |
10- Storied Training Center Provided with IT Facilities.
|
TS, ST, A, D, E/M, E/T, S |
|
December 2014 |
Asian Development Bank/ ADB |
|
3 |
Consultancy Services for Extension of 150 MW
Power Plant up to 2258 MW Combined cycle Power Plant at Khulna under NWPGCL /
PDB Financed� by
ADB. Client: Bangladesh Power Development Board. |
150MW Power Plant. Land
Development Boundary wall, Deep Tube well, Over head
Water Tank, Water Treatment Plant Surface Drainage, Sewerage Treatment,
Pavement Road office Building, Staff Quarter, Dormitory, Boiler- house, Stem-
Turbine, Gas- Turbine Work- ship, Open Yard, Main- Power Plant Building etc.
Owner Engineer for Design Review & Supervision of Power Plant. |
TS, ST, A, D, E/M, E/T, S |
|
December -2016 |
Asian Development Bank/ ADB |
|
4 |
Consultancy
Services For �Management, Design And Supervision� Of
Secondary Towns Water Supply & Sanitation Sector Project (GOB-ADB), ADB
Loan No. 2265-Ban (SF). (16 � Municipalities) Natore, Sirajgonj, Jessore,
Mymensingh, Sherpur, Netrokona,
Kishoregonj, Choumohoni, Laksmipur, Madaripur, Foridpur,
Pirojpur, Jhenaidha, B.Baria, Moulvibazar. Client:
Department of Public Health Engineer (DPHE) |
The Project Includes (i) project management and monitoring,
(ii) planning and design of sub-projects, (iii) contract structuring,
tendering, execution, and management, (iv) construction supervision, (v)
preparation of health education program, (vi) preparation of the tariff
awareness program; and The consulting services will also include significant
engagement of NGOs to manage the sanitation program, communal water-supply
infrastructure improvements, and awareness programs the Project: (vii) piped
supply with individual house connections; (viii) shared standpipes; and (ix)
shared deep HTW or water points, utilizing arsenic-free groundwater sources
for poor households. (x) Improved supply and demand management, (xi)
reduction in the unaccounted for water (UFW), (xii)
water conservation by the customers, and ultimately (xiii) extension of the
daily water supply hours. �
Feasibility
Study for 12-Sub-Project (District-Town) under this project. �
Baseline
Survey (Topographic Survey) �
House
Hold Survey, Survey of existing Landuse Map. �
AIRP =
Capacity 300 M3/hr. = 8 nos. Production
Tube well = 78 nos. Over head
water tank = 18 nos. of 680 m3 (capacity /each). �
Surface
Water Treatment Plant (SWTP) = 4 nos. capacity = 300 m3 / hr. �
SWTP,
Capacity = 600 m3 / hr. at Pirajpur. �
Water
Distribution Pipe Line �
110mm
to 315 mm dia = 100.60 km �
100 mm
to 300 mm dia = 71.72 km �
School
Latrine �
Renovation
of existing line �
Construction
new water connection line, water meter connection etc. |
TS, ST, A, D, E/M, E/T, S |
|
June 2014 |
Asian Development Bank/ ADB |
185.0 Lakh |
5 |
Consultancy Services for Construction of 150MW
Power Plant Project at Khulna & 150MW Power Plant Project at Sirajgonj under PDB/NWPGCL. Funded by ADB Client: Bangladesh Power Development Board. |
150MW Power Plant. Land
Development Boundary wall, Deep Tube well, Over head
Water Tank, Water Treatment Plant Surface Drainage, Sewerage Treatment,
Pavement Road office Building, Staff Quarter, Dormitory, Boiler- house, Stem-
Turbine, Gas- Turbine Work- ship, Open Yard, Main- Power Plant Building etc. |
TS, ST, A, D, E/M, E/T, S |
|
December-2013 |
Asian Development Bank/ ADB |
|
6 |
Consultancy Services for Architectural &
Engineering Design and Supervision of 4-Horticulture Training Centre (HTC)
under Northwest Crops Diversification Project (DAE), Financed by ADB. 4 Sites: Tebunia (Pabna), Natore, Kallyanpur (Chapai
Nawabgonj) and Burirhat
(Rangpur). Client:
Directorate Agriculture Extension (DAE). |
Construction
of each site : Total 4 sites Construction of Functional
Building (Extension), Dormitory Building (Extension), Cooling Centre,
Training Centre, Repair, Maintenance & Renovation Work of others existing
Building, Construction of Boundary Wall, Construction of Internal Road,
Culvert and Land Development work. |
TS,
ST, A, D, E/M, E/T, S |
|
December
2006 |
Asian Development Bank/ ADB |
10.56
Lakh |
7 |
Horticulture
Development Project (HDP) Funded by ADB Loan No. 1010 BAN (SF), Part-C Horticulture Centre at under Directorate
of Agriculture Extension (DAE) at 14 sites (Total
14-site including about 300-unit of structure). |
Construction of each site : �
Laboratory cum functional building with Training �
2-storied PSO/CSO Quarter �
4-storied SSO/SO Quarter �
4-storied single accommodation �
Facilities, Nursery shed, �
Gardener & Guard shade �
Residential building, Repairing & renovation �
Land development, �
Deep tube well, Pump house, Water reservoir & irrigation channel
& irrigation system, �
Internal road, boundary fencing �
Sub-station & electrification work �
Threshing floor, Implement shade �
Supply of furniture etc. at Kallyanpur,
Baradi, Rahmatpur, Ramghar,
Natore, Tebunia, Daulatpur, Rajbari, Jamalpur, Keyotkhali,
Gaital-Solakia, Balaghata,
Panchgachia, Barirhat |
TS, ST, A, D, E/M, E/T, S |
|
Sept. 1999 |
Asian Development Bank/ ADB |
|
8 |
Horticulture
Research Centre Project Funded by Asian Development Bank (ADB) Loan No. 1010
BAN (SF) Horticulture Research Centre at Joydebpur
under Bangladesh Agriculture Research Institute (BARI), Ministry of
Agriculture (Total
5-sites including about 100-unit of structure) Client:
Bangladesh Agriculture Research Institute (BARI), Ministry of Agriculture. |
Planning,
Designing & Managing construction of the following works: �
2-storied Laboratory cum functional
building with conference hall & Library �
2-storied field house �
Threshing Floor, Nursery shed, Implement shed �
Irrigation channel & irrigation facilities �
Sub-station, Electrification work �
Deep tube well and pump house, water reservoir �
Internal road, Potter shed, Garage, Godown Vegetable &
Citrus Research Station at Akbarpur, Moulvibazar: Construction of- �
2-storied PSO/CSO Quarter �
3-storied SSO/SO Quarter �
4-storied single accommodation for
officer �
4-storied single accommodation for
staff �
Laboratory building with conference hall field house �
Furniture work etc. |
TS, ST, A, D, E/M, E/T, S |
Tk. 16.00 Crores |
May 1998 |
Asian Development Bank/ ADB |
|
|
SAUDI- FUND
FOR DEVELOPMENT / SFD |
||||||
1 |
Consultancy Service for Design Review &
Construction Supervision for Construction of Teesta Bridge (1490.M) Long.
Bark Protection work about 75 KM. Upazila Road, 11 Nos. Bridge (50M to 100
M), 45 RCC. Culvert of LEGED at Gaibandha District
Funded by SAUDI- FUND for Development (SFD) OPEC. Client: LGED. |
2x150MW Power Plant.
Land Development Boundary wall, Deep Tube well, Over
head Water Tank, Water Treatment Plant Surface Drainage, Sewerage Treatment,
Pavement Road office Building, Staff Quarter, Dormitory, Boiler- house, Stem-
Turbine, Gas- Turbine Work- ship, Open Yard, Main- Power Plant Building etc. |
TS, ST, A, D, E/M, E/T, S |
|
|
SFD |
|
2 |
Detail Design & Construction Supervision for
Construction of R.C.C. Jetty and approach road in Kutubdia
Offshore Island, Cox�s Bazar. Client: BIWTA. |
Construction of R.C.C.
Jetty at (a)
Satteruddin (b)
Baraghope |
TS, ST, A, D, E/M, E/T, S |
Tk. 6.25 Crores |
1996 |
SFD |
24.50 Lakh |
|
IFAD |
||||||
1 |
Live �
Stock Development for Small & Marginal Farmers in 80- Elected Thena
Funded by IFAD- Loan under DLS � 280 BA. Under DLS. |
Consultancy
Services for Design & Construction Supervision of 2- Storied Poultry,
Sheed, Deep Tube well, Water Reservoir, ump- house, Water Supply, Drainage,
Feed mixture mix room, Store- room, Boundary wall, internal road Electricity
etc. |
TS, ST, A, D, E/M, E/T, S |
3.50 Crores |
1997 |
IFID |
6.50 Lakh |
|
JICA |
||||||
1 |
Poultry
Management Technique improvement Project BLRI- SAVAR. Funded by JICA |
Design
& Supervision of 2- Storied office Building, 2-Storied Laboratory
Building, Various Animal- Sheed, Internal Road, Electricity, Deep Tube well,
Pump house, Water Reservoir etc. |
TS, ST, A, D, E/M, E/T, S |
3.10 Crores |
August-
2001 |
JICA |
5.0 Lakh |